Seasons Road Interchange
Start Date: Late Fall 2008
Completion Date: Spring 2010
Total Cost: $15.1 Million
Project Description: Construction of a new interchange at SR 8 and Seasons Road. The project will include entrance and exit ramps for both directions on SR 8.
Maintenance of Traffic: A minimum of two lanes of traffic will be maintained in each direction during peak traffic hours. A minimum of one lane of traffic will be maintained on SR 8 in each direction during non-peak hours. Seasons Road will be closed throughout the duration of the project. Traffic will be detoured via Hudson Drive to Steels Corners Road to Wyoga Lake Road to Seasons Road. Access to all residences and establishments will be maintained throughout construciton.